⮜ Per-commit progress metrics

– [Reverse-engineering] [th05] Shared HUD gaiji row (ba3a6f7158630cbdeefa5624f1c684f5acf3b746)

Not yet reverse-engineered x86 instructions
ZUN.COM OP Main Cutscenes Total
TH01 0 5533 51287 6881 63701
TH02 257 0 24127 2272 26656
TH03 1344 3130 25540 4196 34210
TH04 168 4013 26241 3809 34231
TH05 226 4054 25233 6220 35733
Total 1995 16730 152428 23378 194531
Completion percentage (reference values)
ZUN.COM OP Main Cutscenes Total
TH01 100 % 16.09 % 2.90 % 11.66 % 5.89 %
TH02 58.08 % 100 % 5.51 % 44.35 % 22.53 %
TH03 3.31 % 29.87 % 2.98 % 27.47 % 9.89 %
TH04 0.00 % 28.21 % 9.38 % 23.24 % 13.72 %
TH05 0.00 % 28.37 % 11.84 % 13.53 % 14.31 %
Total 30.90 % 36.84 % 6.06 % 21.58 % 12.15 %

Maximum number of absolute memory references
ZUN.COM OP Main Cutscenes Total
TH01 0 203 2832 315 3350
TH02 0 0 1428 171 1599
TH03 0 129 1786 195 2110
TH04 0 214 1243 191 1648
TH05 0 213 1380 392 1985
Total 0 759 8669 1264 10692
Probability of position independence (reference values)
ZUN.COM OP Main Cutscenes Total
TH01 100 % 13.62 % 3.11 % 10.26 % 7.56 %
TH02 n/a 100 % 22.31 % 53.66 % 37.59 %
TH03 n/a 60.67 % 9.16 % 53.46 % 22.23 %
TH04 n/a 52.44 % 39.42 % 47.53 % 42.50 %
TH05 n/a 54.29 % 38.67 % 27.94 % 39.11 %
Total 100 % 58.62 % 21.40 % 38.25 % 28.84 %