⮜ Per-commit progress metrics

– [Reverse-engineering] [th02/th04/th05] .map file loading (f98fba3c9d3ad4943b193844722248391601860d)

Not yet reverse-engineered x86 instructions
ZUN.COM OP Main Cutscenes Total
TH01 0 5597 51393 6945 63935
TH02 257 0 24361 2332 26950
TH03 1390 3938 25961 5254 36543
TH04 168 4795 28252 4486 37701
TH05 226 4881 27883 6771 39761
Total 2041 19211 157850 25788 204890
Completion percentage (reference values)
ZUN.COM OP Main Cutscenes Total
TH01 100 % 15.12 % 2.70 % 10.84 % 5.55 %
TH02 58.08 % 100 % 4.59 % 42.89 % 21.68 %
TH03 0.00 % 11.76 % 1.38 % 9.18 % 3.74 %
TH04 0.00 % 14.22 % 2.43 % 9.59 % 4.98 %
TH05 0.00 % 13.76 % 2.58 % 5.87 % 4.65 %
Total 29.30 % 27.47 % 2.71 % 13.50 % 7.47 %

Maximum number of absolute memory references
ZUN.COM OP Main Cutscenes Total
TH01 0 219 2868 331 3418
TH02 0 0 1658 201 1859
TH03 0 239 1849 343 2431
TH04 0 334 1910 301 2545
TH05 0 344 2119 491 2954
Total 0 1136 10404 1667 13207
Probability of position independence (reference values)
ZUN.COM OP Main Cutscenes Total
TH01 100 % 6.81 % 1.88 % 5.70 % 5.68 %
TH02 n/a 100 % 9.79 % 45.53 % 27.44 %
TH03 n/a 27.13 % 5.95 % 18.14 % 10.39 %
TH04 n/a 25.78 % 6.92 % 17.31 % 11.20 %
TH05 n/a 26.18 % 5.82 % 9.74 % 9.39 %
Total 100 % 38.06 % 5.67 % 18.56 % 12.10 %