⮜ Per-commit progress metrics

– [Reverse-engineering] [th04/th05] Redrawing dirty stage background tiles (c00b87ed4f6aea7b693f160565ee7860edb8e085)

Not yet reverse-engineered x86 instructions
ZUN.COM OP Main Cutscenes Total
TH01 0 5563 51321 6911 63795
TH02 257 0 24225 2332 26814
TH03 1344 3219 25567 4311 34441
TH04 168 4102 27109 3895 35274
TH05 226 4153 26141 6299 36819
Total 1995 17037 154363 23748 197143
Completion percentage (reference values)
ZUN.COM OP Main Cutscenes Total
TH01 100 % 15.64 % 2.83 % 11.27 % 5.76 %
TH02 58.08 % 100 % 5.12 % 42.89 % 22.07 %
TH03 3.31 % 27.87 % 2.88 % 25.48 % 9.28 %
TH04 0.00 % 26.62 % 6.38 % 21.50 % 11.09 %
TH05 0.00 % 26.63 % 8.66 % 12.43 % 11.71 %
Total 30.90 % 35.68 % 4.86 % 20.34 % 10.97 %

Maximum number of absolute memory references
ZUN.COM OP Main Cutscenes Total
TH01 0 212 2843 324 3379
TH02 0 0 1463 201 1664
TH03 0 179 1800 257 2236
TH04 0 263 1406 235 1904
TH05 0 267 1537 435 2239
Total 0 921 9049 1452 11422
Probability of position independence (reference values)
ZUN.COM OP Main Cutscenes Total
TH01 100 % 9.79 % 2.74 % 7.69 % 6.76 %
TH02 n/a 100 % 20.40 % 45.53 % 35.05 %
TH03 n/a 45.43 % 8.44 % 38.66 % 17.58 %
TH04 n/a 41.56 % 31.48 % 35.44 % 33.57 %
TH05 n/a 42.70 % 31.69 % 20.04 % 31.32 %
Total 100 % 49.78 % 17.95 % 29.07 % 23.98 %