⮜ Per-commit progress metrics

– Merge the second halves of TH04's and TH05's MAIN.EXE back into the main files (5268241a0651dcb801f56728f17ef6c262b44aa4)

Not yet reverse-engineered x86 instructions
ZUN.COM OP Main Cutscenes Total
TH01 479 7041 53259 8236 69015
TH02 613 3648 24695 3659 32615
TH03 1390 4182 26040 5324 36936
TH04 168 5058 28369 4532 38127
TH05 226 5144 28001 6818 40189
Total 2876 25073 160364 28569 216882
Completion percentage (reference values)
ZUN.COM OP Main Cutscenes Total
TH01 2.24 % -6.78 % -0.83 % -5.74 % -1.96 %
TH02 0.00 % 12.73 % 3.28 % 10.38 % 5.21 %
TH03 0.00 % 6.30 % 1.08 % 7.97 % 2.71 %
TH04 61.02 % 9.52 % 2.03 % 8.67 % 4.54 %
TH05 55.51 % 9.12 % 2.17 % 5.21 % 4.27 %
Total 16.20 % 5.34 % 1.16 % 4.17 % 2.30 %

Maximum number of absolute memory references
ZUN.COM OP Main Cutscenes Total
TH01 0 245 2931 361 3537
TH02 0 278 1719 337 2334
TH03 0 285 1916 351 2552
TH04 0 381 1938 304 2623
TH05 0 391 2147 494 3032
Total 0 1580 10651 1847 14078
Probability of position independence (reference values)
ZUN.COM OP Main Cutscenes Total
TH01 100 % -4.26 % -0.27 % -2.85 % 2.40 %
TH02 n/a 21.69 % 6.47 % 8.67 % 8.90 %
TH03 n/a 13.11 % 2.54 % 16.23 % 5.93 %
TH04 n/a 15.33 % 5.56 % 16.48 % 8.48 %
TH05 n/a 16.09 % 4.58 % 9.19 % 6.99 %
Total 100 % 13.85 % 3.43 % 9.77 % 6.30 %