⮜ Per-commit progress metrics

– [Reverse-engineering] [th04/th05] Rendering all stage background tiles at once (20d05c1653aa0ff8c0287e5bedb55b0c4cecc9d8)

Not yet reverse-engineered x86 instructions
ZUN.COM OP Main Cutscenes Total
TH01 0 5563 51321 6911 63795
TH02 257 0 24228 2332 26817
TH03 1344 3219 25567 4311 34441
TH04 168 4102 27248 3896 35414
TH05 226 4153 26281 6300 36960
Total 1995 17037 154645 23750 197427
Completion percentage (reference values)
ZUN.COM OP Main Cutscenes Total
TH01 100 % 15.64 % 2.83 % 11.27 % 5.76 %
TH02 58.08 % 100 % 5.11 % 42.89 % 22.06 %
TH03 3.31 % 27.87 % 2.88 % 25.48 % 9.28 %
TH04 0.00 % 26.62 % 5.90 % 21.48 % 10.74 %
TH05 0.00 % 26.63 % 8.18 % 12.41 % 11.37 %
Total 30.90 % 35.68 % 4.69 % 20.33 % 10.84 %

Maximum number of absolute memory references
ZUN.COM OP Main Cutscenes Total
TH01 0 212 2843 324 3379
TH02 0 0 1604 201 1805
TH03 0 179 1800 257 2236
TH04 0 263 1436 235 1934
TH05 0 267 1564 435 2266
Total 0 921 9247 1452 11620
Probability of position independence (reference values)
ZUN.COM OP Main Cutscenes Total
TH01 100 % 9.79 % 2.74 % 7.69 % 6.76 %
TH02 n/a 100 % 12.73 % 45.53 % 29.55 %
TH03 n/a 45.43 % 8.44 % 38.66 % 17.58 %
TH04 n/a 41.56 % 30.02 % 35.44 % 32.52 %
TH05 n/a 42.70 % 30.49 % 20.04 % 30.49 %
Total 100 % 49.78 % 16.16 % 29.07 % 22.66 %